20161028

Construction finished . . . we have a kitchen . . . pending painting . . . and curtains . . . and . . . etc.

Coming in the back door you see . . .

Then turn to look at the stove . . .

Walk in and look back toward the door . . .

This is the wall you are following in from the back door down the hall . . .

as you head down the hall toward the dining room . . .

here is the hall down between the butler pantries . . . the kitchen pantry, broom closet and a half bath.

a decent sized half bath

with fairly comfortable area . . . and curtains are coming!

The broom closet pull out . . . with storage closet above.

Dining room as you come in from the kitchen hall

Dining room looking back from the living room

The laundry has moved to the second floor . .  in the current master bath.

A good amount of linen closet space.

With more closets on the other side . . .

and the machines in the middle.
It has been a long time coming . . . still have the bathroom to finish, but I think painting the kitchen and dining room is the first priority . . . and perhaps the outside stucco painting . . .

No comments: